Ann Street School – Iron Bound : Masonry restoration and new roof. The Project consisted of cut and point 50,000 square feet of brick masonry. The original building constructed in 1886 with additions done in 1915 and 1930. The project included terracotta repair and replacement. Construction costs were $2 Mil.
-
Roseville Avenue School – Newark, N.J. Early Childhood Learning Center – Feasibility study to convert existing elementary school into a new early childhood learning center.
-
The Chancellor Avenue Annex Elementary School – Re-roofing project that included new drain installation and configuration. It also included roof deck replacement.
-
Newark, NJ - The Multi-Roof Replacement - Re-roofing Project for: The M.X. Shabazz H.S., Weequahic H.S., Avon Avenue, Hawthorne Avenue, and Chancellor Avenue Schools. Silicone/Polyurethane Foam System. $2.6 Mil.
-
West Side H.S. - Roof Replacement Project - Silicone/Polyurethane Foam System.
-
West Side H.S. - Roof & Storm drainage restoration
-
West Side H. S. - Masonry Restoration of interior court.
-
The Arts High School - Re-roofing Project Silicone/Polyurethane Foam System.
-
Weequahic H.S. Field House Renovation including toilets, showers and locker room.
-
Weequahic H.S. Unterman field sports announcers box interior renovation and a new sound system.
-
The Peshine Elementary School: Auditorium renovation included new seating, stage and window curtains.
-
The Peshine Elementary School: Interior courtyard playground
-
The George Washington Carver School: Gymnasium renovation including renovation to toilets and locker rooms.
-
The Hernandez School: Gymnasium renovation, included new wood floor logo and refinishing. Toilet renovation.
-
Technical High School: Auditorium renovation including new seating, stage and window curtains/drapes. Interior finishes and chandelier restoration.
Ramapo-Indian Hills Board of Education:
-
Franklin Lakes, NJ - Indian Hills High School - Re-roofing Project Phase II
-
Indian Hills High School - New Trainers Rehab Suite Design and project administration.
-
Indian Hills High School - Reroofing Project Phase I.
-
Ramapo Regional High School - New Lighting & Control System for the Auditorium and stage.
-
Ramapo High School - Special Education Classroom
-
Ramapo High School - Universal Workout Classroom
-
Indian Hills High School - Video Room
-
Indian Hills High School - Weight Room.
Bound Brook Board of Education:
-
Bound Brook High School: New science lab restorations.
-
Bound Brook High School: Masonry restoration.
-
Bound Brook High School: Stage structural repairs.
-
Lamont School: Multi-purpose Room structural restoration, emergent project.
-
Smalley School: Science Lab restoration.
-
Smalley School: Proposed gymnasium addition.
-
Smalley School: Boiler replacement.
-
High School Playing Field: New bleacher and accessible entry.
-
Lamont School Boiler: Replacement.
-
Harding Township School - Board of Education
-
Harding Elementary School: New Roof replacement.
Marlboro Township Board of Education
-
Asher Holmes School: Masonry Restoration and New Roof Project.
-
Frank Defino Elementary School-Silicone/Polyurethane new roof and re-roofing project
-
Marlboro Elementary School: New roof project.
-
Marlboro Middle School: New Roof installation and Masonry restoration and waterproofing.
Sparta Board of Education:
-
Mohawk Avenue School: New roof replacement.
-
The Helen Morgan School: Roof replacement.
Oradell Board of Education:
-
Oradell Elementary School - Re-roofing Project - Silicone/ Polyurethane Foam System
Harding Township Board of Education:
-
Re-roofing the Harding Elementary School - Installation and re-coating of the roof to maintain this sustainable roof system.
Fort Lee Board of Education:
-
Fort Lee School No. 1: Façade restoration- the original brick constructed in the turn of the century was deteriorating shortly after construction. The remedy at that time was to cover the brick with a brick face stucco that was dangerously falling apart. The new façade was applied after removing the stucco and solidifying the original brick and installing a new façade well anchored to the conditioned masonry.
-
Fort Lee, NJ - Schools No. 1 & No. 4 Roof Replacement Project - Silicone/Polyurethane Foam System $435,000
-
Fort Lee High School: Dance Studio installation.
-
Fort Lee Middle School: Installation of dewatering system for the improvised basement. We installed six heavy duty pumps to drain water. Collecting troughs were placed below slab to drain a constant flow of ledge rock water.
-
Fort Lee High School: - Re-roofing Project - Silicone/Polyurethane Foam System. $500,000
-
Lewis F. Cole Middle School - Reroofing Project - Silicone/Polyurethane Foam System
-
School No. 2 - Re-roofing Project.
-
School No. 3 – Re-roofing Project.
-
School No. 4 – Re-roofing project.
Plainfield Board of Education:
-
Plainfield, NJ - Hubbard School & Board Administration Office
-
Building, Reroofing Project - Silicone/Polyurethane Foam System.
-
Maxon Middle School - Re-roofing Project - Silicone/Polyurethane Foam System
-
Clinton School - Masonry Restoration and waterproofing
-
Maxon Middle School - Masonry Restoration and Waterproofing
-
Emerson School - Masonry Restoration and Waterproofing
-
Evergreen School - Masonry and Terra Cotta - Restoration and Waterproofing
-
Jefferson School - Masonry Restoration and Waterproofing
Ridgewood Board of Education:
-
Ridgewood, NJ - Ridgewood High School - Conversion of High School to Total Barrier Free in accordance with Americans with Disabilities Act.
-
Ridgewood High School - Preparation of Long-Range Five Year Facility Plan for submission to the NJ State Department of Education for 1990 - 1995
-
George Washington Junior High School - Computer Room Renovations.
-
George Washington Junior High School - Ridgewood Arts Center - For the Performing Arts.
-
George Washington Junior High School - New Kitchen Exhaust and Make-up Air Unit.
-
Benjamin Franklin Middle School - Masonry Restoration and Waterproofing.
-
Willard School - Removal of existing suspended ceiling, refurbish vaulted ceiling structure and installation of new metal halide and quartz lighting.
-
George Washington Junior High School - Chair Lift & Dark Room - New Barrier Free lift to gain access to the Gymnasium to comply with ADA Regulations.
-
Ridgewood High School - Renovations to the Trophy Room, School Store and Cafeteria.
-
Orchard School - Reroofing Project.
-
George Washington Junior High School - New Boiler Replacement.
-
Glen School - New Furnace Replacement
North Bergen Board of Education:
-
North Bergen, NJ - Preparation of the 5 Year Long Range Facility Plan for the Board of Education 1985-1990. Addition and Alteration to the Board of Education Administration Offices.